Explore published transmission lines, natural-gas pipelines and highway context around our land. Start with the Pah Rah Range / Sparks Village group, then inspect any of the 52 parcel records.
Golden Nevada landSolid yellow: county GISDashed yellow: reference trace
Mapped infrastructure is a starting point for utility due diligence. Line voltage is not available MW. Pipeline proximity does not establish distribution service, gas volume or pressure. Highway proximity does not establish legal access, driveway approval or interchange access. Fiber connectivity is a commercial network reference, not an engineering alignment or parcel connection.
REGIONAL INFRASTRUCTURE / TRANSPORTATION & DIGITAL BACKBONE
Projects that shape the region.
Official project information and published maps, with project status kept separate from service available to our properties.
Planning concepts · not open roads
La Posada–USA Parkway / Northeast Connector
RTC’s final feasibility study identifies La Posada and Vista Boulevard (Golden Eagle) as feasible corridors between Spanish Springs / east Sparks and TRIC. No preferred corridor or commitment to construction is established by that study. The published alignments require refinement and subsequent review, funding and approvals.
Relevant to regional circulation around the Pah Rah Range holdings; no access entitlement or crossing of a specific Golden Nevada parcel is asserted. The RTC project page remains the source for subsequent decisions.
FHWA announced an $11.9 million grant in July 2023 for a bypass to move highway traffic away from Wadsworth’s residential streets and improve travel to I-80. The Pyramid Lake Paiute Tribe publishes a project map dated 2025.
Included as a regional transport project. An open-to-traffic date and parcel-specific access benefits have not been verified.
Switch reports existing fiber connections linking its Tahoe Reno campus with San Francisco, Los Angeles and Las Vegas. Its current campus page advertises 4.5 ms to the Bay Area; latency is the provider’s claim for its network, not a guarantee for our land.
The map’s dashed line connects reference endpoints schematically. Physical routing, nearby splice points, lateral build costs and service to each APN require carrier confirmation.
BLM approved a buried fiber right-of-way north of I-80, from Spanish Springs Canyon east of Sparks to west of Clark, through the Pah Rah Range. The announcement places it in the same corridor as Nevada’s Middle Mile Project.
Approval does not establish that this segment is built, lit, or available at our property boundaries. The official project maps supply the proposed alignment; no approximate line is drawn across our parcels.
BLM approved a 404-mile northern Nevada Middle Mile route along the I-80 corridor in September 2025. Separately, Zayo announced completion of its 622-mile Umatilla–Prineville–Reno route in November 2025.
These are distinct projects and statuses. Existing regional backbones do not establish a connection to an individual APN.
NV Energy describes Greenlink West and North as major 525 kV additions. Its current overview targets May 2027 service for Greenlink West and describes North between Ely and Yerington. These are regional grid projects, not dedicated supplies to Golden Nevada parcels.
Use NV Energy’s latest project updates for schedule and route changes. Parcel load capacity, energization dates and costs require a utility study and agreement.
NV Energy publishes a fact sheet for the existing Frank A. Tracy Generating Station east of Reno and a regional renewable-project map identifying Dodge Flat Solar. NextEra separately describes a proposed Dodge Flat expansion of up to 200 MW solar plus 200 MW battery storage, subject to approvals.
Generation near land does not establish surplus capacity, a right to interconnect or an allocation to a development.
Tract’s current Peru Shelf page lists 810 MW with February 2027 site energization, and South Valley lists 1,215 MW with September 2027 energization. Sapphire near Silver Springs lists 700 MW under utility study.
These are developer-published project plans, not power available for purchase at Golden Nevada land. Figures are not added together as spare regional capacity.
Approximate straight-line distances to the nearest line in the published datasets. County boundaries, reference traces and approximate point locations have different precision, shown in each row. Missing parcel locations remain pending.
APN / land
County / acres
Location basis
Transmission line
Gas pipeline
Highway context
Service / legal access
Map sources & next verification.
Transmission: federal community’s archived U.S. Electric Power Transmission Lines layer, with source dates retained per feature. Gas: EIA interstate / intrastate pipeline layer. Retrieved 24 October 2026. These regional inventories may omit distribution assets and recent changes; the closest mapped asset may not be the closest real asset.
Roads: NDOT I-80 / US-50 centerlines and labeled basemap roads; they do not establish public access rights. Parcel outlines use the source status already shown in the parcel presentation.
For a development proposal, request parcel-specific utility responses covering available MW, voltage, feeder or substation work, timeline and cost; carrier route and lateral quotes; gas pressure and volume; and recorded access easements / road approvals. No service commitment has been obtained through this map.